USE CASE · PRODUCTION PLANNING

Plan without straining capacity or missing a deadline.

Production planning is the continuous matching of demand to capacity, work order to schedule, and schedule to reality on the floor. WinPremium tests the order against capacity, shows conflicts and delivery risk before the plan is approved, and updates the schedule as the floor progresses.

winpremium · Production Planning Board
WinPremium production planning board — Gantt schedule, capacity utilization and plan summary

Planned / Actual

1,250 / 1,058

this week · units

On-time delivery (OTD)

92.6%

target 95%

Avg. cycle time

4.2 h

per work order

Late work orders

6

of 62 open

THE PLANNING CYCLE

From demand to production, a closed loop.

Tap a step to see what planning checks at that stage and what it triggers. If capacity falls short, the loop returns to replanning automatically.

STEP 2 / 6

Tested against capacity

Machine, labor and shift capacity are measured against demand. If sufficient, the plan proceeds; if not, an alternative scenario and reschedule are built.

Check: An alert is raised if the load threshold is exceeded.

Machine load · %

Offset-01
Cellophane-01
Die-cut-01
Corrugated Line

WHAT DOES PLANNING CHANGE?

You promise on capacity, not on guesswork.

Realistic due dates

The promised date is verified against capacity; a keepable due date instead of an empty promise.

Visible bottlenecks

An overloaded line is flagged before the plan is approved; the job moves to another resource.

A self-updating plan

As the floor progresses the schedule updates automatically; the plan stays alive in production, not on a desk.