Realistic due dates
The promised date is verified against capacity; a keepable due date instead of an empty promise.

USE CASE · PRODUCTION PLANNING
Production planning is the continuous matching of demand to capacity, work order to schedule, and schedule to reality on the floor. WinPremium tests the order against capacity, shows conflicts and delivery risk before the plan is approved, and updates the schedule as the floor progresses.
Planned / Actual
this week · units
On-time delivery (OTD)
target 95%
Avg. cycle time
per work order
Late work orders
of 62 open
THE PLANNING CYCLE
Tap a step to see what planning checks at that stage and what it triggers. If capacity falls short, the loop returns to replanning automatically.
STEP 2 / 6
Machine, labor and shift capacity are measured against demand. If sufficient, the plan proceeds; if not, an alternative scenario and reschedule are built.
Check: An alert is raised if the load threshold is exceeded.
Machine load · %
WHAT DOES PLANNING CHANGE?
The promised date is verified against capacity; a keepable due date instead of an empty promise.
An overloaded line is flagged before the plan is approved; the job moves to another resource.
As the floor progresses the schedule updates automatically; the plan stays alive in production, not on a desk.

USE CASE · PRODUCTION PLANNING
Production planning is the continuous matching of demand to capacity, work order to schedule, and schedule to reality on the floor. WinPremium tests the order against capacity, shows conflicts and delivery risk before the plan is approved, and updates the schedule as the floor progresses.
{{ k.label }}
{{ k.sub }}
THE PLANNING CYCLE
Tap a step to see what planning checks at that stage and what it triggers. If capacity falls short, the loop returns to replanning automatically.
STEP {{ activeNum }} / 6
{{ activeBody }}
Check: {{ activeControl }}
{{ activeMetricLabel }}
WHAT DOES PLANNING CHANGE?
{{ o.desc }}